111. Distributed energy station in Nanjin county

I. Project, construction scale and location: Using natural gas resources in Nanjin county to cogenerate power. The project is situated at Nanjin county.

II. Construction reasons and conditions: To improve the energy using efficiency, reduce pollutant emissions and increase the proportion of clean energy consumption in the high-tech garden of Nanjin county.

III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa. 2 billion RMBV. Project contact enterprise: Nanjing County Development and Reform Bureau Project contact: Wu Longquan

Tel: 788***

E-mail:NJXFZHGGJ**[ta]**.com

 

112. The project of distributed energy station in  Xintai industrial zone

I. Project, construction scale and location: Using natural gas resources in Xingtai industrial zone to cogenerate power. The project is situated at Changtai county.

II. Construction reasons and conditions: To improve the energy using efficiency, reduce pollutant emissions and increase the proportion of clean energy consumption in the Xingtai industrial zone, Changtai county.

III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa. 2 billion RMBV. Project contact enterprise: Changtai County Development and Reform Bureau Project contact: Huang Aping

Tel: 832***

E-mailctxfgj**[ta]**.com

 

113. The project of warm water Creek power station

I. Project, construction scale and location: Planning installed capacity of 25 thousand kilowatts. The project is located in Huaan county.

II. Construction reasons and conditions: Improve the level of comprehensive utilization of Watershed III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa. 500 million RMBV. Project contact enterprise: Huaan County Development and Reform Bureau

Project contact: Li Xiuqin

Tel: 736***

E-mailhaxfgj**[ta]**.com

 

114. Municipal solid waste incinerator plant and supplementary project in Pinghe county

I. Project, construction scale and location: Build power station that burn trash 400 ton/day. The capacity of power station is 12,000 kW. Build 19 sets of supporting garbage transfer station

Telephone number16 sets of transportation vehicles, power plant auxiliary facilities (such as available power, water and road as well as flat field) and landfill site, etc. Project location is in Pinghe County.

II. Construction reasons and conditions: The garbage disposal capacity of Nanjin county and Pinghe county is qualified. The garbage is treated at a nearby place.

III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa. 500 million RMBV. Project contact enterprise: Pinghe County Development and Reform Bureau Project contact: Zeng Pengcheng

Tel: 736***

E-mailfgj-ph**[ta]**.com

 

115. Municipal solid waste incinerator plant and supplementary project in Huaan county

I. Project, construction scale and location: Build power station that burn trash 400 ton/day. The capacity of power station is 12,000 kW. Build supporting waste transfer station, transportation vehicles,  power station three supplies and one leveling ancillary facility and landfill, etc. Project location is in Hua’an County.

II. Construction reasons and conditions: The garbage disposal capacity of Huaan county and Changtai county is qualified. The garbage is treated at a nearby place.

III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa. 450 million RMBV. Project contact enterprise: Huaan County Development and Reform Bureau

Project contact: Li Xiuqin

Tel: 736***

E-mailhaxfgj**[ta]**.com

 

116. Municipal solid waste incinerator plant and supplementary project in Zhaoan county

I. Project, construction scale and location: Build power station that burn trash 400 ton/day. The capacity of power station is 12,000 kW. Build supporting waste transfer station, transportation vehicles,  power station three supplies and one leveling ancillary facility and landfill, etc. Project location is in Zhao’an County.

II. Construction reasons and conditions: The garbage disposal capacity of Zhaoan county and Changtai county is qualified. The garbage is treated at a nearby place.

III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa. 450 million RMBV. Project contact enterprise: Zhaoan County Development and Reform Bureau Project contact: Hu Boyuan

Tel: 332***

E-mailzaxfzhggj**[ta]**.com

 

117. LNG power plant project in Zhangzhou

I. Project, construction scale and location: Taking two units of 360 thousand kilowatts into consideration.The project is located in Longhai City.

II. Construction reasons and conditions: Promote clean energy, meet the needs of power supplying in Zhangzhou city and improve the reliability of power grid.

III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa. 2.2 billion RMBV. Project contact enterprise: Longhai City Development and Reform Bureau Project contact: Chen Dongpeng

Tel: 788***

E-maillhzdb30307**[ta]**.com

 

118. The project of distributed photovoltaic power generation and agricultural photovoltaic power generation on building roofs in Pinghe county

I. Project, construction scale and location: Install the unit with the capacity of 60 thousand kilowatts. This project is situated at Pinghe county.

II. Construction reasons and conditions: Clean energy and increase the integrated utilization of the land.

III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa. 600 million RMBV. Project contact enterprise: Pinghe County Development and Reform Bureau Project contact: Zeng Pengcheng

Tel: 736***

E-mailfgj-ph**[ta]**.com

 

119. The project of distributed photovoltaic power generation and agricultural photovoltaic power generation in Nanjin county

I. Project, construction scale and location: Install the unit with the capacity of 60 thousand kilowatts. This project is situated at Nanjin county.

II. Construction reasons and conditions: Clean energy and increase the integrated utilization of the land.

III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa. 600 million RMBV. Project contact enterprise: Nanjing County Development and Reform Bureau Project contact: Wu Longquan

Tel: 788***

E-mailNJXFZHGGJ**[ta]**.com

 

120. The project of distributed photovoltaic power generation in Longhai county

I. Project, construction scale and location: Install the unit with the capacity of 60 thousand kilowatts. This project is situated at Longhai county.

II. Construction reasons and conditions: Clean energy and increase the integrated utilization of the land.

III. Preliminary work of the project: In the process of planning.

IV. Project total investmentCa. 600 million RMBV. Project contact enterprise: Longhai City Development and Reform Bureau Project contact: Chen Dongpeng

Tel: 788***

E-maillhzdb30307**[ta]**.com

 

121. West Lake Ecological Park Complex

I. Project, construction scale and location: The content of the project is to build a smart and innovative water city full of international fashion and dynamic elements, integrating business service, leisure and entertainment, health recuperation and low-carbon life. The overall floorage of the entire development is 3,432,000 square meters, with its address in the cohesive zone between the main urban area and Zhangzhou Jinfeng Economic Development Zone.

II. Construction reasons and conditions: The area is designed to be the green city sub-center of western Zhangzhou featured by its cultural tourism, business & leisure and health maintenance, as well as the important area of Zhangzhou for rebuilding “impressions of the water city”.

III. Preliminary work of the project: In the process of planning and design IV. Project total investment12.4 billion RMBV. Project economic and efficiency analysis: The annual revenue of the business activities in this area is expected to be over RMB 5 billion yuan upon completion.

VI. Project liaison unit: Xiangcheng District Development and Reform Bureau

Project contact: Li Chaoqun

Tel13605083***

Fax0596-205***

E-mailxcqfgj**[ta]**.com

 

122. Water Supply System Project of Guokeng Town Area in Longwen Distric

I. Project, construction scale and location: The content of the project is to build a water supply system with a total length of 12 kilometers.The project is located in Guokeng Town.

II. Construction reasons and conditions: In recent years, the scope of water supply in Guokeng Town is increasingly expanding, while the existing water supply system is to some extent putting restrictions on water supply quanitity of the water plant for its small scale, unreasonable layout and small diameter. In addition, the household water-consumption in Kuokeng Town is base on railway waterworks which has small water producing ability scale, high cost, and poor water supply security. The water supply network construction in Guokeng Town must be enforced.

III. Preliminary work of the project: In the process of preliminary work.

IV. Project total investment50 million RMBV. Project economic and efficiency analysis: Firstly, it can solve the drinking problem of Guokeng Town residents, ensure the drinking water hygiene, and improve the residents living standards; secondly, it can attract external investment and promote the construction of large scale projects.

VI. Project liaison unit: Longwen District Guokeng Town People’s Government Project contact: Xu Huizhong

Tel0596-218***

E-mailxhz583626**[ta]**.com

 

123. Water Supply System Project of Guokeng Town Area in Longwen Distric

I. Project, construction scale and location: The content of the project is to build a water supply system with a total length of 16.3 kilometers.The project is located in Guokeng Town.

II. Construction reasons and conditions: At present, the waste water of Guokeng Town is not included in the unified treatment of sewage disposal plants, thus some of the projects failed to land due to the failure of getting the approval of the environment assessment, contributing to the impacts on the economy. The pavement of the sewer lines of Kuokeng Bridge has been completed in 2014, but the construction of the sewer lines and the lift pump station has not started, so that the sewage has no access to the municipal sewage pipe network.

III. Preliminary work of the project: In the process of preliminary work.

IV. Project total investment50 million RMBV. Project economic and efficiency analysis: It may attract external investment and promote the construction of large scale projects VI. Project liaison unit: Longwen District Guokeng Town Peoples Government Project contact: Xu Huizhong

Tel0596-218***

E-mailxhz583626**[ta]**.com

 

124. Bailu Forest Park Eco-tourism Area

I. Project, construction scale and location: The content of the project is to build a toursit area integrating lesure, health maintenance, vacation, communication, experience, entertainment, sport, visits, and other functions. The location of the project is to be in Chitu Village, Zhangpu County, with a planning area for development of 8000 mu.

II. Construction reasons and conditions: Bailu Forest Park is planned to be built at He’an Mountain, Xiagong Village, Chitu Township, Zhangpu County, with the County Road Fotan-Suian Line running all the way along the scenic area. The scenic area is 10 kilometers away from both Zhangpu County and the Zhangpu Interchange of Shenhai Highway

Telephone number15 kilometers away from the the Zhangpu stop of Xiamen-Shenzhen Express Rail, forming a very convenient transport, forming the very convenient traffic.

V. Preliminary work of the project: In the stage of planning.

VII. Project total investment1 billion RMBV. Project economic and efficiency analysis: It will promote the tourism economy and employment development of the periphery regions upon completion.

VI. Project liaison unit: The People’s Government of Chitu Township, Zhangpu County Project contact: Chen Zhiyuan

Tel0596-386***

Fax0596-386***

E-mailctx3860616**[ta]**.com

 

125. Shanmei Wetland Park Project

I. Project, construction scale and location: The constructions of the project mainly include an artificial wetland landscape, a ecological wetland park, an artificial lake, a square, vegetation of the park and supporting facilities. The location of the project is to be at the east of National Highway No.324 and the north of Shanmei Mountain, with a planning land area of 805.5 mu.

II. Construction reasons and conditions: For the purpose of protecting the important wetland resources of Shanmei area and preventing land reclamation from beaches, according the principle of adhering to combining ecological river governance, flood drainage and pollution control, building an artificial wetland ecological system in the north of Shanmei Mountain, increasing flood detention area and strengthening the wetland’s self-purification is of great significance.

III. Preliminary work of the project: The specilized planning formulation on urban landscape is in progress.

IV. Project total investment400 million RMBV. Project economic and efficiency analysis: Effectively strengthen the wetlands self-purification.

VI. Project liaison unit: Yunxiao County Construction Bureau Project contact: He Wenhui

Tel0596-601***

Fax0596-853***

E-mailyxcsjs**[ta]**.com

 

126. Pinghe County Green Corridor

I. Project, construction scale and location: The content of the project is to build a green corridor within 50 meters along the brook on both sides, with a total length of 23973 meters (among which 8942 meters in Xiaoxi Town and 15031 meters in Banzai Town) and a total area of 1799 mu (among which 671 mu in Xiaoxi Town and 1128 mu in Banzai Town).

II. Construction reasons and conditions: Huashan Brook river reach, the location of the project, is the upper reach of the West Brook of Jiulong River and the source of drinking water for the county residents. The construction and implementation of the green corridor will greatly improve the residents’ drinking water quality and the surrounding ecological environment.

III. Preliminary work of the project: Year schedule plan has been finished.

IV. Project total investment200 million RMBV. Project economic and efficiency analysis: Upon completion of the project, the people along the river may save their costs at over RMB 2 million yuan in drinking water and crops irregation. Further more, beautiful ecological environment is conducive to the development of ecological tourism, so as to bring the people along the river business opportunities.

VI. Project liaison unit: Pinghe County Forestry Bureau Project contact: Zhang Weimin

Tel0596-521***

Fax0596-526***

E-mailylgzwm**[ta]**.com

 

127. Jiuhou Mountain Tourism Development Project

I. Project, construction scale and location: Jiuhou Mountain Scenic Area is planned to be constructed into four areas, including selenium spring water pavillion area, Shiyang Mountain house area, pinery wooden house area and Zen garden area, together with related tourism supporting infrastructures. The location of the project is to be at the Jiuhou Mountain Area, Jinxing Township, Zhao’an County, with a land area of about 600 mu.

II. Construction reasons and conditions: Zhao’an Jiuhou Mountain Scenic Area has the beautiful natural environment, time-honored history and a wealth of scenic spots. Known as Jiuhou Mountain Eighteen Scenes, it has been enjoying a long standing reputation. Thus it has the most potential be become a national four-A level scenic area.

III. Preliminary work of the project: The conceptual design of Jiuhou Mountain scenic area has been completed. The land acquisition of for the project is about to begin.

IV. Project total investmentCa.550 million RMBV. Project economic and efficiency analysis: The construction and development of the project will make the overall pattern of the scenic area achieve a qualitative leap, so as to provide the villagers from the surrounding villages with job opportunities and promote the development of local economy.

VI. Project liaison unit: Zhao’an County Sidu Town People’s Government Project contact: Wu Qiusheng

Tel1815067***

Fax0596-355***

E-mail15860215869**[ta]**.com

 

128. Lazhou Xianglinta Scenic Area Project of Meiling Town, Zhao’an County

I. Project, construction scale and location: The content of the project is mainly to build tourist service centers and tourism infrastructures such as scenic area square, parking lot, green planting, and scenic area road hardening, etc. The location of the project is to be at Lazhou Village, Meiling Town, Zhaoan County, with a planning area of 250 mu.

II. Construction reasons and conditions: Lazhou Village has the typical marine culture resource clusters, with the advantage of the mountains and the sea, focusing on experiencing the fishing culture, so as to build a “ecological fishing culture” with costal characteristics, which may increase the output of aquatic products and additional value.

III. Preliminary work of the project: The planning on Xianglinta Scenic Area and the field engineering of the parking lot has been completed, and the budget of the scenic area’s main stems is in progress.

IV. Project total investment110 million RMBV. Project economic and efficiency analysis: The construction and development of the project will promote the development of the service industry and the catering industry, increase the additional value and the annual output of the aquatic products, and provide our town with over 1000 employment positions.