132. Project on Ecological Environment Modification and Protection of Nanyi Resorvior,
I. Project, construction scale and location: The content of the project is to implement the pollution treatment of the upper reach of Nanyi Reservior, the comprehensive improvement of surrounding villages and rurual environment, the water ecological restoration and proteciton, on-water garbabe collection of the reservior area, etc.项目选址漳州市南靖县奎洋镇。
II. Construction reasons and conditions: This can be used as the second water source for
III. Preliminary work of the project: Relevant planning works have been carried out.
IV. Project total investment:580 million RMBV. Project economic and efficiency analysis: This can be used as the second water source for
VI. Project liaison unit: Nanjing County Water Conservancy Bureau Project contact: Huang Shengyang
Tel:1390696***
Fax: 782***
E-mail:njslj7822626**[ta]**.com
I. Project, construction scale and location: The content of the project is to implement the Forest Ecological Landscape Promotion Project with the area of 15000 mu at the area of”two alongs and one around”( “along the Provincial Road Guanjiu Line, along the Shenhai Highway Conplex Line and around the County (
II. Construction reasons and conditions: The implementation of the Forest Ecological Landscape Promotion Project may greatly improve the peripheral ecological environment and strengthen the safety of the traffice along the road.
III. Preliminary work of the project: Year schedule plan has been finished.
IV. Project total investment:150 million RMBV. Project economic and efficiency analysis: Upon completion, the numerous people in the key area may save their costs in drinking water and crops irrigation of over RMB 3 million yuan. Furthure more, the beautiful ecological tourism is condusive to the development of ecological tourism, so as to bring the people there business opportunities.
VI. Project liaison unit: Pinghe County Forestry Bureau Project contact: Zhang Weimin
Tel:0596-521***
Fax:0596-526***
E-mail:ylgzwm**[ta]**.com
134. Leisure Agriculture and Rural Tourism Project of
I. Project, construction scale and location: The content of the project is to construct a 5000-mu ecological agriculture leisure base, the 600-mu Zhushi Lingguang ecological hamane scenic area, 900-mu Huangxikeng reservoir natural scenic area, 800-mu Baizhanglin ecological base and 170-mu Zhingqingyuan theme lesure scenic area. The location of the project is to be at
II. Construction reasons and conditions:
III. Preliminary work of the project: The premilinary works inculding project site selection, ground mapping, feasibility research, and planning & design have been completed.
IV. Project total investment:600 million RMBV. Project economic and efficiency analysis: Good investment prospects.
VI. Project liaison unit: Changtai County Banli Township People’s Government Contact Person: Xu Linbin
Tel:0596-827***
Fax:0596-827***
E-mail:ctblxrmzf**[ta]**.com
135. Mayangxi Ecological Leisure Agriculture Project of
I. Project, construction scale and location: The content of the project is to construct the landscape revetment, leisure sidewalks along the brook, water dropping landscape dam, grape planting sightseeing garden greenhouse, etc. The location of the project is to be at Mayangxi ecological tourism area,
II. Construction reasons and conditions: The content of the project is to build a holiday resort integating agricultural sightseeing and leisure tourism, based on Mayang Brook’s favorable ecological environment and tourism resources.
III. Preliminary work of the project: The preliminary works of the project have been completed.
IV. Project total investment:100 million RMBV. Project economic and efficiency analysis: Depends on specific project.
VI. Project liaison unit: Mayangxi Ecological Tourism Area of Changtai County Contact Person: Xiao Hongyong
Tel:0596-831***
Fax:0596-831***
E-mail:ctblxrmzf**[ta]**.com
136. Sewage Disposal Plant and Pipe Network Supporting Project of Changtai Lindun Industrial District
I. Project, construction scale and location: Build one sewage disposal works 5000 ton/day. Build sewage pipe network
II. Construction reasons and conditions: The construction of Sewage Disposal Plant and Pipe Network Supporting Project will improve the collecting rate and propossing rate of domestic wastewater in Lindun Industiral District, and avoid the domestic wastewater directly being discharged into the rivers which will pollute the water source and the environment.
III. Preliminary work of the project: In the process of preliminary work.
IV. Project total investment:60 million RMBV. Project economic and efficiency analysis: Good investment prospects.
VI. Project liaison unit: Lindun Industrial Area of Changtai County Contact Person: Liang Shifa
Tel:0596-826***
Fax:0596-826***
E-mail:ctldgyq**[ta]**.com
137. Sewage Disposal Plant and Pipe Network Supporting Project of
I. Project, construction scale and location: Build one sewage disposal works 5000 ton/day. Build sewage pipe network
II. Construction reasons and conditions: The construction of Sewage Disposal Plant and Pipe Network Supporting Project will improve the collecting rate and propossing rate of domestic wastewater in
III. Preliminary work of the project: In the process of preliminary work.
IV. Project total investment:60 million RMBV. Project economic and efficiency analysis: Good investment prospects.
VI. Project liaison unit:
Tel:0596-825***
Fax:0596-825***
E-mail:ctfydzb**[ta]**.com
138. Construction Project on
I. Project, construction scale and location: The content of the project is to construct the Jinshan Red Cone Forest Park (including a parking lot, tourist sidewalks, pavillions, etc.), specimen museum of animals and plants, the Jade Gallery, Wooden House Spring Villa, etc. The location of the project is to be at Jinshan Red Cone Forest Park of Hua’an County.
II. Construction reasons and conditions: Hua’an Jinshan Red Cone Forest Park, with the area of 3000 mu, is the largest red cone forest protection base of
III. Preliminary work of the project: The pre-planing has been completed.
IV. Project total investment:80 million RMBV. Project economic and efficiency analysis: Annual tourists are 500,000 and revenue is 30 million RMB.
VI. Project liaison unit: Hua’an County Development and Reform Bureau Project contact: Tang Juewen
Tel:1360697***
Fax:0596-736***
E-mail:haxfgj**[ta]**.com
139. Hua’an Jade Geological Park Construction Project
I. Project, construction scale and location: The content of the project is to develop and construct Hua’an Jade Geological Park. The location of the project is to be along the lakebed of
II. Construction reasons and conditions: After thousands of years’ river erosion, the rare jade stones of Hua’an was created by the universe, with clear textur, gorgeous colors, in thousands of postures, which make it to be a treasure among all the are stones. The consturction of
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:100 million RMBV. Project economic and efficiency analysis: Annual tourists are 500,000 and revenue is 30 million RMB.
VI. Project liaison unit: Hua’an County Development and Reform Bureau Project contact: Tang Juewen
Tel:1360697***
Fax:0596-736***
E-mail:haxfgj**[ta]**.com
140. Guanyinshan Park of Zhangzhou Development Zone
I. Project, construction scale and location: The content of the project is to build the mountanious park landscape, a
II. Construction reasons and conditions: Zhangzhou develpmnet zone is equiped with a convenient three-dimensional transportation system consists of the sea, the land and the air. It takes only 15 minutes for the sea bus to directly get to the center of
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:500 million RMBV. Project economic and efficiency analysis: The annual visitor of the development zone is expected to be over 500,000, which may bring a large number of consumers.
VI. Project liaison unit: Economic Development Bureau of Zhangzhou Development Zone Project contact: Lin Lvfeng
Tel:1364608***
Fax:0596-685***
E-mail:lhzdb30307**[ta]**.com
Urban construction
141. Close Urban Ring Road of Zhangzhou
I. Project, construction scale and location: There are 7 projects to be implemented in downtown area of Zhangzhou, including commencement of North Ring Road broadening and modification and implementation of
II. Construction reasons and conditions: Closure of ring road network enables vehicles accessing downtown area to pass through the city directly via ring roads, reducing large vehicles and transit vehicles entering main trunk roads of downtown area. Besides, it also facilitates citizens to realize rapid passing through via ring road network. Implementation of the project is beneficial for improving urban traffice environment and alleviating urban traffic jam.
III. Preliminary work of the project: Construction of South Ring Road (
IV. Project total investment:21.26 billion RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
142. Overpass Treatment at Some Intersections in Downtown Area of Zhangzhou (Overpass Construction)
I. Project, construction scale and location: To build overpasses for
II. Construction reasons and conditions: After overpass treatment, some intersections form rapid ring road partially to improve traffice capacity and efficiency and to alleviate traffic pressure.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:500 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
143. Yuanshan Public Transportation Hub in Downtown Area of Zhangzhou
I. Project, construction scale and location: To build Yuanshan Public Transportation Hub integrating public transportation hub, parking lot, energy supplement, maintenance and repair, and office management. The project, covering about
II. Construction reasons and conditions: There is no official public transportation hub in downtown area of Zhangzhou currently. With further growth of urban public transportation routes and mileages, it is in urgent need to build public transportation hub to reduce interchange distance and time among various transportation modes, to facilitate citizen traveling, and to serve urban production and life.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:200 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
144. Build Charging Piles in Downtown Area of Zhangzhou
I. Project, construction scale and location: To provide 11,000 dedicated charging piles in urban area and to add 6 sets of urban public charging stations and 1,100 scattered public charging piles. The project is located in the center area of
II. Construction reasons and conditions: There are a few charging piles at public transportation terminal stations in downtown area. With popularizing of electric vehicles, it is urgent to build charging piles.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:100 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
145. Parking System (Parking Meter) within Urban Border Line of Zhangzhou
I. Project, construction scale and location: To provide 13,000 rod-type parking meter in downtown area. With the help of background service software, foreground operation system software, mobile apps and mobile communication service, swiping card payment service and various management functions for parking are realized. The project locates in downtown area.
II. Construction reasons and conditions: Providing parking system is able to improve service efficiency and turnover rate of roadside parking, alleviating parking issues in urban area.
III. Preliminary work of the project: In the process of preliminary planning.
IV. Project total investment:50 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
146. Mazhou Sewage Treatment Plant in High-tech District of Zhangzhou
I. Project, construction scale and location: To build medium-sized sewage treatment plant with outlet water index up to Standard A of Level I stipulated in national Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant. The project, covering 3.3 hectares, locates in northeast of Yuanshan Xincheng Planning Area in High-tech District of Zhangzhou. II. Construction reasons and conditions: As an environmental protection engineering, the project is benefitial for reducing discharge of harmful substance in sewage and alleviating impact of sewage discharge on water quality of rivers after its construction and operation.
III. Preliminary work of the project: Project address has been determined; survey, design, compilation of water and soil conservation proposal, and environmental impact assessment report are onging.
IV. Project total investment:200 million RMBV. Project contact enterprise: Zhangzhou Development and Reform Bureau
Contact: Zhang Guorong
Tel:0596-202***
Fax:0596-202***
E-mail:fjzztzk**[ta]**.com
147.The Second Potable Water Source in Urban Area of Zhangzhou
I. Project, construction scale and location: To build water source protection project and pipeline network project, and to install